Scope Change & Margin Recovery Planner

An extra equipment day or return visit changes the economics of a job. See the cost of a scope change, the price needed to hold your margin, and how much discount room remains.

Your entries stay in this browser and are not submitted to us.
Starting your private workspace…My workbench →

Saved on this device only. Use job references rather than customer details. Download a backup before clearing browser data.

Before you absorb “one small extra”

Price the change

Example: extra crew time, materials, and two more equipment days on a water-related job. Replace these sample numbers.

The math behind the answer

Extra cost = crew-hours × loaded hourly cost + extra materials + extra equipment. Required total price = all direct costs ÷ (1 − target gross margin). Additional price needed = required total price − original contract price, with a minimum of zero.

The target applies to the entire revised job. This can also reveal a shortfall in the original quote. Gross margin excludes overhead and taxes; the result does not establish contract rights, insurance reimbursement, or customer authorization. Document a scope change and agree the price before proceeding.

Free download · Built to use with your next job

Keep the margin after the quote.

Take the job-cost and scope-change formulas into an editable workbook your office can use on every job.

  • 7-tab Excel workbook with formulas, worked examples, and blank rows for your jobs
  • 12 ready-to-adapt messages for open estimates, scope questions, and next steps
  • 14-day rollout plan + optional CRM field and automation map

Free. Email only. Instant access after signup, plus a link in your inbox.